Warning signs, like the one shown above, were placed at Columbia River Park recently, in anticipation of the upcoming Veterans Memorial Bridge rehabilitation project.
The Veterans Memorial Bridge (Route 462) rehabilitation project, overseen by PennDOT, will involve a major overhaul of the bridge connecting Columbia and Wrightsville, Pennsylvania, including a complete deck replacement, structural repairs, and improvements for pedestrians and cyclists, with an anticipated three-year closure of the bridge during the middle phase of construction, likely starting around 2027, where traffic will be detoured to Route 30; the project aims to address structural deficiencies while enhancing safety and mobility for all users, including upgrades to the Wrightsville intersection with a roundabout and improved lighting to manage mayfly swarms.
Key points about the project:
Scope of work:
Extensive repairs to the bridge structure, including replacing the entire deck, barriers, and horizontal support beams, while preserving the existing arches and piers.
Bridge closure:
The bridge will be completely closed to all traffic (vehicles, pedestrians, cyclists) for approximately three years during the main construction phase.
Detour route:
Traffic will be directed to US Route 30 during the closure.
Pedestrian and cyclist accommodations:
Plans include improvements to pedestrian and bicycle access, including new bike lanes and wider sidewalks.
Intersection improvements:
A roundabout will be constructed at the Wrightsville intersection of Route 462 and Hellam Street.
Mayfly management:
Lighting modifications will be implemented to help mitigate issues caused by mayfly swarms.
Important details:
Project timeline: Construction is expected to begin around 2027 and last several years.
Public input: PennDOT is actively engaging with the community to address concerns and provide updates on the project.
Cost: The estimated project cost is significant, with figures exceeding $200 million.
[Source: AI Overview]
No comments:
Post a Comment