Columbia Borough faces $400K repair bill for Columbia Crossing; concerns were raised in 2013
Columbia Borough faces a $400K repair bill for structural rot at Columbia Crossing. The building is plagued by structural concerns dating back to 2013. JOE LINTNER | COLUMBIA SPY Columbia Borough Council voted at its March 24, 2026 meeting to take a step towards repairing serious structural deterioration at the Columbia Crossing River Trails Center, (estimated at nearly $400,000) by authorizing staff and the borough engineer to pursue state grant funding to offset the cost. Engineering firm C.S. Davidson found extensive internal rot in most of the building's laminated wood support columns as well as in the lower ends of its sloped beams. According to a borough executive brief, "the cause of the column rot appears to be from water being trapped at the base of the columns behind the stone veneer. The beam rot appears to be from water being trapped in the metal connections." Rinaldo: “If the building becomes a risk, then we will take more immediate action." However, ...