Tuesday, January 10, 2023

Public Works Department Report for December 2022


Public Works Department Report for December 2022

● UGI Gas Main Replacement
The Contractor is currently working on Barber Street installing the new gas main. Once the main is installed and charged up the Contractor will start connecting the services to the new main along Lancaster Ave, South Twelfth Street, Grinnell Ave and Barber Street

● Columbia Hometown Heroes
Borough Crews have been assisting with installing banners on streetlight and utility poles throughout the Borough. 204 banners have been installed thus far

● Tree Maintenance
Borough Crews will begin tree trimming throughout the Borough in conjunction with the street sweeper routes and primarily those trees that interfere with sweeping at the curb line

● Sign Maintenance
Crews continue working on inventory and replacement of signs throughout the Borough

● Leaf Collection
The last day of leaf collection was Friday, December 9, 2022. Crews have done a great job keeping up with leaf collection this season. 69 Loads of leaves have been collected this season

● Borough Yard Waste Recycling Facility
Crews have been working around the weather at the facility to catch up on processing materials delivered in 2022. The 15 Municipalities dropped off 189.73 Tons of yard waste in December. Compost purchased by Contractors through December brings the total to 3,060 cu yds purchased year to date

● Christmas Tree Drop-Off
Christmas Trees may be dropped off Saturday January 14, 2023 at the Columbia Borough Fire Dept located at 10th & Manor St and also at the Borough Yard Waste Recycling Facility from 8 am until 12 pm

● In 2021, 3,535.24 Tons of yard waste were brought into our facility by the 14 Municipalities at a cost of $106,369.50 and 2,125 cu yds of Compost was purchased by Contractors at the cost of $21,250.00. The 2021 Total with Yard Waste and Compost = $127,619.50.

● In 2022, 3,499.75 Tons of yard waste were brought into our facility by the 15 Municipalities at a cost of $122,295.50 and 3,060 cu yds of Compost was purchased by Contractors at the cost of $30,600.00. The 2022 Total with Yard Waste and Compost = $152,895.50