Wednesday, July 30, 2014

Tuesday, July 29, 2014

Coming next Tuesday

Some still confused by detour route

Some drivers are still confused by the route of the recent detour.  This trucker turned down Walnut Street from Second and, after seeing the signage at the end of the street, turned right onto Front Street.  Similar replays have occurred in the surrounding blocks over the past two days.


Sinkhole reroutes detour during railroad work in Columbia

The detour route for the railroad crossing closure on Route 441 in Columbia Borough has been changed to repair a sinkhole.

MORE:
http://m.lancasteronline.com/news/local/sinkhole-reroutes-detour-during-railroad-work-in-columbia/article_c69e73be-1739-11e4-bdf5-001a4bcf6878.html?mode=jqm

Monday, July 28, 2014

New parking rates

Don't forget: Parking meter rates recently doubled from 25 cents for 60 minutes to 25 cents for 30 minutes.
Plug the meter for the appropriate amount.
Violators will be ticketed.

Construction is underway

Construction on the railroad crossing on Route 441 between Locust and Union Streets and adjacent areas along the railroad tracks got underway today.  Detours have been set up to reroute traffic around the area.




Veterans Memorial Bridge cleanup costs

The cost of the recent mayfly cleanup on the Veterans Memorial Bridge was absorbed by the  construction company, according to Ahmad Mahmoud, project manager for Kuharchik.
Borough Manager Sam Sulkosky said that instead of multiple cleanups, they waited until the mayfly season was over.
"There's no use cleaning it up and coming back two weeks later to do it all over again," he said.
In the future, the borough will be responsible for maintenance, including mayfly cleanup, which will cost about $2,000 for labor and supplies.