Two electrical transformers were installed underground on the 100 block of Locust Street today - one on each side of the street. Abel Inc and JMF Underground, who were contracted by PPL, installed the transformers under the surface of each sidewalk. Resident parking spaces were temporarily unavailable on the block due to the large number of work trucks and personnel.
Why??
ReplyDeleteTo protect us when the decepticons come.
DeleteOuch to the sidewalks
ReplyDelete